BIM Electrical Diploma
Working hours
Monday | 9:30 am - 6.00 pm |
Tuesday | 9:30 am - 6.00 pm |
Wednesday | 9:30 am - 6.00 pm |
Thursday | 9:30 am - 6.00 pm |
Friday | Closed |
Saturday | 9:30 am - 6.00 pm |
Sunday | 9:30 am - 6.00 pm |
- الوصف
Table of contents (for each Lesson) and to be shared on the Academy Web Site
Chapter 1 (BIM – LOD – BIM Documents – BIM Workflow Process)
? What is BIM
BIM Process
Model Requirements
BIM Dimensions (3D – 4D – 5D – 6D – 7D)
- 3D Model
- Brief Intro of 4D Time Analysis Study (for BIM specialist)
- 5D Cost Analysis Study (for BIM specialist)
- 6D Sustainability Study (Energy Engineer)
- 7D Facility management – COBIE (for BIM specialist)
LOD (100 – 500) and LON , LOI
- LOD (Level of Details) Stages from 100 – 200 – 300 – 350 – 400 – 500
- LON (Level of Need)
- LOI (Level of Information)
General BIM Standards
- Object Coding and classifications ISO 19605.
BIM Documents
- BEP (BIM Execution Plan) – Detailed explanation of BEP Management steps:
- Define Project goals and scope
- Assemble the BIM teams
- Tools and software
- CDE (Common data environment)
- Collaboration protocols
- Starting model
- Creating initial BIM Models
- BIM Template Model Checklist
- Coordination
- Model clash detection and coordination
- Shop drawing
- Prepare for construction handover.
- Implement quality control and validation
- As built drawing
- Along the BIM process
- Training and continuous Improvement
- Monitor and update models during construction (4D , 5D) Responsibilities for each Role
- AIR (Assets Information Requirements)
- PIP (Pre-appointment Implementation plan)
- MIDP (Master Information Delivery/Drawing Plan)
- BOQ (Bill of Quantity)
- CDE (Common Data Environment)
- RFI (Request for Information)
- MS (Material Submittal)
- Clash Matrix
Chapter 2 (Revit Software General for all disciplines)
Worksharing
- Worksharing goal
- Worksets vs layers in Autocad
Revit File Types
Revit User-interface
How Revit looks at elements inside it
Revit Links and Dwg Links vs Xref in Autocad
Revit Commands
- Selection Tools. o Modify Tools. o Manage Tools o View Tools o Annotate Tools o Insert Tools o System Tools (Electrical Tools) o Revit Options and Settings
Data (Parameters in Revit)
- Parameters Types (Project – Family – Shared – Global – Built-in)
- Parameter Host Types (Instance – Type)
- Parameter Storage Types (Length – Text – Yes/No – etc. ….)
Creating Views
- Creating Floor, RCP plan views o Object Styles o View Model Visibility o View Annotation Visibility o Worksets Visibility o Links Visibility o Scale and Detail Level o Visual Style o View Range and Plan Region o Underlay and Discipline for the View o Creating View Template o View Types o Element Overrides vs Filters o Hidden Elements vs Temporary Hide or Isolate in the view o Scope Box
- Duplicate Views (Duplicate – Duplicate with detailing – Duplicate as dependent)
- Sections and Elevation Views o Callout View o Matchline and View References
Creating Sheets
- Creating Sheets Manually o Creating Title Blocks o Printing Vs Exporting PDF o Printing Settings o Exporting into Dwg format o Dwg Export Settings
Browser Organization for Views and sheets
Revit Schedules
Key Schedules
View List and Sheet List
Project Templates
Transfer Project Standards
Model Health and what affect its speed
Coordinates
Understand Project location Points
- Internal Origin
- Project Base Point
- Survey Point
True North Vs Project North
Setting First Model Coordinates
Acquire Coordinates from Main Model to other Models
Setting Federated Model
Publish Coordinates from the Federated Model to other Models
Chapter 3 (Starting an Electrical Project in Revit)
Preparing the model
- Linking Architectural models o Copy/monitor levels, and grids. o Checking Shared Coordinates o Importing/Linking MEP design IFC DWG drawings.
Electrical Modeling (LOD 350 – 400 )
- Electrical EQU. , Electrical devices and lighting fixtures, and understanding Hosting in Revit
- Electrical Settings and Justification Standards for Cable Trays, Conduits, Wires and Loads o Electrical systems (circuits, switch systems) o Containment ( conduit, cable trays, wires)
- Low Current Devices (Fire Alarm, Data Devices, Communication Devices, Security Devices) o Demand Factors and Load Classifications o Electrical Panels Schedules and Voltage Drop Calculation on Revit o Model interference check (clash detection) o Design options
Electrical documentation ( LOD 350 – 400 – 500)
- Manipulating Views (Preparing views and sheets – schedules – panel schedules )
- Annotation ( Wiring – tags – schedules – legends ) o Export and printing
Chapter 4 (Coordination from Electrical perspective and using tools of Navisworks and Revit)
Electrical Coordination
- Containment Coordination o Technical Quality Check
Electrical Coordination with Arch
- Ceiling Coordination o Floor Tiles Coordination o Wall Coordination
MEP Coordination
- Checking Main Clashes before going to Navis o Finding Best Route for all Disciplines
Clash detection on Navisworks and solving them on Revit
- Exporting NWC from Revit Model o Understanding the Types of Navisworks Files (NWC, NWF, NWD) o Creating Clash Tests and Checking Results
Chapter 5 (Brief Concept of Electrical Families)
Family creation workflow
Parameters and Formulas in Revit Families
Creating electrical fixtures and lighting fixtures from scratch as per factory material submittals
Understanding MEP Connectors in Families Annotation Families
Chapter 6 ACC (Autodesk Construction Cloud)
What is ACC
Steps to set up a project
ACC Documents
BIM Collaborate Pro Publishing Files
Extra (brief intro about add-ins and dynamo)
Diroots
Main Important and useful tools in Diroots
Pyrevit
How to starts adding python scripts to Revit using Pyrevit
Dynamo
Brief Intro about Dynamo and how useful and important it is for the BIM Process
Other useful add-ins
BEP (BIM Execution Plan)
CDE (Common Data Environment)
MIDP (Master Information Drawing Plan)
BOQ (Bill Of Quantity)
Getting Started
- Product Overview
- Understanding user interface
- Opening and Appending Files in Navisworks
- Saving, Merging, Refreshing, and Publishing Files
- The Autodesk Navisworks Engine
- Selection Tree and Selecting Objects
- Object Properties
- Animations, Sectioning, and Hyperlinks
3D Model Review
- The Autodesk Navisworks Engine
- Navigation tools
- Selection Tree & Selecting Objects
- Search Sets
- Hiding Objects & Overriding Materials
- Object Properties
- Creating viewpoints
- Adding Comments and Redlining
- Measuring and Moving Objects
- Sectioning
- Comparing Models
- Switchback
Clash Detective
- Creating clash matrix and creating the clash tests from it.
- Setting Clash Rules .
- Performing Clash Tests and updating the tests with the updating of Revit files.
- Creating the hard, clearance and duplicates clash tests.
- Export and Import Clash Tests .
- Using the search sets for automating clash tests.
- Using Switchback tool to automatically select the elements in Revit to solve the clash.
- Performing Time-Based Clash test to find clashes with temporary elements in the time of construction.
- Manage and review Clash Results.
- Grouping clash results and adding comments to it.
- Assigning tasks to specific members regarding clash results.
- Produce Clash Reports with data of location and elements clashed and image, ….
- Auto update clash tests when updating models.
Quantification
- Setting up a Quantification Project
- Creating the Item’s catalog with the required work break down structure.
- Creating the resources catalog and linking resources to items catalog.
- Perform model takeoff using the automatic and manual techniques .
- Editing the way Navisworks translates Revit parameters and controlling the way Navisworks calculates quantities.
- Perform virtual takeoff and assigning viewpoints and manual measurements to it.
- Using sheet browser to link 2d sheets with the 3D BIM model.
- Performing 2d takeoff’s from Autocad files or PDFs or even images.
- Using 2d takeoff tools to find quantities of count, linear and area elements.
- Export takeoff data to Excel and make use of pivot tables.
- Applying and disapplying quantification coloring code .
- Update and analyze data
4D simulation and time liner
- Overview of TimeLiner Tool
- Creating and managing TimeLiner tasks.
- Creating the WBS of tasks using indentation and sorting tools.
- Using Gantt chart to control planned dates and actual dates.
- Managing Time liner costs .
- Importing and managing data from Primavera and Ms
- Auto update tasks data like dates and costs when updated in Primavera file.
- Attaching Element to time liner tasks using manual and automatic techniques.
- Checking the quality of the planning schedule by finding the unmentioned tasks.
- Checking the quality of 4D model by finding elements not attached to tasks or attached to multiple tasks.
- Creating and editing task types and their visualization rules.
- Exporting TimeLiner Schedules
- Creating and reviewing construction 4D simulations.
4D simulation and time liner
- Controlling the Text data attached to the 4d simulation like dates active tasks, cost, …
- Controlling the 4D simulation duration, resolution and quality.
- Attaching a walk through animation to the 4D BIM model.
- Attaching an object animation to each task.
- Exporting images and videos from TimeLiner 4D simulation.
Additional tools
- Rendering and visualization tools.
- Using data tools to add databases to elements.
- Using appearance profile to automate the applying of color codes to elements.
- Using patch utility to automate creating .NWCs, NWFs, NWDs .
- Using selection inspector tool to analyze selection.
- Exporting elements BIM data to Excel.
- Importing data from excel or access to Navis-works.
INTRODUCTION
What is ACC and why is it important؟
Account Manager vs Project Manager
Steps to set up a project and add companies and people
ACC Documents
What is ACC DOCS؟
Steps to set up project folders Steps to add people to folders
Steps to set up file labels
Steps to set up reviews
Steps to set up issues
BIM Collaborate Pro
BIM Collaborate Pro settings
What is Collaboration Design
Department management
People management
Model coordination
Publishing Files to Project Parties And Practical Training
Save files
ACC cloud work-sharing
Exploring models from ACC
Publishing and receiving files 1
Publishing and receiving files 2
Automatically detecting conflicts and creating issues
Creating reviews
1. Introduction to BIM and ISO 19650
- Understanding BIM fundamentals and terminology.
- Introduction to ISO 19650 Standard
- Explanation of essential terms specific to ISO 19650 and BIM.
2. Principles of Information Management
- Information Management Concepts
- The role and importance of information management in BIM projects.
- Overview of Organizational, Asset, and Project Information Requirements in ISO 19650
- Introduction to Common Data Environment (CDE), its purpose, and configuration under ISO 19650.
3. ISO 19650 Standards and Framework
- Detailed overview of ISO 19650-1 (Concepts and Principles).
- Detailed overview of ISO 19650-2 (Delivery Phase of the Assets).
- Detailed overview of ISO 19650-3 (Operational Phase)
- Detailed overview of ISO 19650-5 (Security-minded approach).
4. Roles and Responsibilities in BIM
- Identifying roles and responsibilities, including BIM Managers, Coordinators, and Modelers.
- Detailed role of the Information Manager in line with ISO 19650 standards.
- Creating and understanding (RACI) matrices for BIM roles.
5. Information Delivery Cycle
- Project Stages and Delivery Phases
- Overview of BIM stages as per ISO 19650, from design to operation.
- Information Management Processes including planning, delivery, and verification of information.
- Managing workflows within a Common Data Environment (CDE).
6. Documentation and Information Requirements
- Exchange Information Requirements (EIR)
- Understanding and creating a BIM Execution Plan (BEP) compliant with ISO 19650.
- Project Information Model (PIM) and Asset Information Model (AIM) in the lifecycle of assets.
7. Information Exchange and Data Validation
- Data Sharing Standards and Protocols
- Model Validation and Verification
- Quality control measures for validating BIM data.
- Information Exchange Workflows
8. Security and Confidentiality in BIM
- Security-Minded Approach in ISO 19650-5
- Data Protection and Access Management
- Overview of confidentiality agreements and ensuring compliance with data protection regulations.
9. Compliance and Implementation in Real Projects
- Practical steps to achieve ISO 19650 compliance in live projects.
- Common obstacles and solutions in implementing ISO 19650 in BIM projects.
- Reviewing examples and case studies of ISO 19650-compliant projects.
10. Future Trends and Advances in BIM Standards
- BIM Standards Beyond ISO 19650
- Future Trends in Information Management and Digital Twins
- Continuous Improvement and Updating BIM Processes